El desequilibrio financiero en los contratos de obra pública en Colombia y su propósito conmutativo
Date
2021-05-03Metadata
Show full item recordCollections
Abstract
El problema de la investigación, pues como se puede observar no es ajeno a la realidad, al ser múltiples las razones que generan el desequilibrio financiero, se debe realizar un análisis que parte desde la planeación de las obras hasta el momento de la respectiva liquidación, hecho que conlleva a que se tengan que realizar reajustes con cifras superiores a las pactadas inicialmente, inclusive realizando obras innecesarias o realizando diseños innecesarios que se contratan por encima de los precios del mercado, generando de ésta manera un detrimento al patrimonio público.
En éste orden de ideas, lo que se busca es determinar que las obras realizadas sean acordes con el dinero que percibe el contratista, pues si se rompe la ecuación a favor del contratista, la entidad se ve perjudicada por detrimento en su patrimonio o viceversa. En este sentido, las circunstancias que atentan contra el patrimonio público son los llamados sobrecostos, entendidos éstos, como el cobro de un valor mayor a los precios del mercado, así como la inseguridad que surge en el momento de aplicar las fórmulas para el respectivo reajuste del precio, en contraste tanto con el valor de los materiales de obra, como todos los costos que surgen en la ejecución de los contratos de obra.
Abstract
The investigation's problem, as it can be observed it is not alien to reality, since there are multiple reasons that generate the financial imbalance, an analysis must be carried out that starts from the planning of the works until the moment of the respective liquidation, A fact that leads to readjustments having to be made with figures higher than those initially agreed, including carrying out unnecessary works or making unnecessary designs that are contracted above market prices, thus generating a detriment to public assets.
In this order of ideas, what is sought is to determine that the works carried out are in accordance with the money received by the contractor, because if the equation is broken in favor of the contractor, the entity is harmed by detriment to its patrimony or vice versa. In this sense, the circumstances that threaten public assets are the so-called cost overruns, understood as the charging of a value greater than market prices, as well as the insecurity that arises at the time of applying the formulas for the respective readjustment. of the price, in contrast to both the value of the construction materials, as well as all the costs that arise in the execution of the construction contracts.
PDF Documents
xmlui.custom.comments.form-panel-heading
Respuesta Comentario Repositorio Institucional
Gracias por tomarse el tiempo para darnos su opinión.
The following license files are associated with this item: