El objeto principal de este informe es mostrar las labores realizadas por el estudiante en la pasantía durante 6 meses en la Constructora MARVAL SAS, reconocida a nivel nacional por su amplia trayectoria, la cual le asignó tres obras, llamadas el Country Masai, ubicada en Floridablanca y en etapa de alistamiento de torre 1-2, y fundida en torre 3-4; el Country Living ubicada en Floridablanca, en etapa de cimentación; y los Caobos ubicada en Girón, en etapa de alistamiento. Las actividades que realizó para poder cumplir con los objetivos propuestos, basándose en 3 funciones principales, la primera de ellas fue verificar el cumplimiento de la metodología lean, liderando las reuniones semanales y intermedias, así como calificando las tareas programadas y planeando nuevas tareas; la segunda de ellas realizando la inspección de los sellos de calidad de obra blanca y obra gris, cada vez que una actividad se estaba finalizando se analizaba que todo hubiera quedado bien, revisando el 25% de la muestra total; y la tercera investigando acerca del proyecto ahorro de agua, para verificar las obras, salas de ventas y oficinas con más desperdicio a nivel nacional. Este informe contiene toda la información de lo realizado por el practicante, junto con registros fotográficos y anexos de los entregables que se ejecutaron.

Abstract

The main purpose of this report is to show the work carried out by the student in the internship for 6 months at the MARVAL SAS Construction Company, recognized nationally for its extensive experience, which assigned him three works, called Country Masai, located in Floridablanca and in stage of preparation of tower 1-2, and melted in tower 3-4; the Country Living located in Floridablanca, in the foundation stage; and the Caobos located in Girón, in the enlistment stage. The activities that they carried out in order to meet the proposed objectives, showed 3 main functions, the first of which was to verify compliance with the lean methodology, leading the weekly and intermediate meetings, as well as qualifying the scheduled tasks and planning new tasks; the second of them carrying out the inspection of the quality seals of white work and gray work, every time an activity was being completed it was analyzed that everything had turned out well, reviewing 25% of the total sample; and the third investigating about the water saving project, to verify the works, sales rooms and offices with more waste at the national level. This report contains all the information of what the practitioner has done, together with photographic records and annexes of the deliverables that are executed.

Idioma

spa

Palabras clave

Citación

Correa Chaparro, G.F. (2023). Verificación de cumplimiento de la metodología Lean Construcción en los proyectos de vivienda Country Masai, Country Living y Los caobos mediante chequeo de actividades de obra en la constructora MARVAL S.A. [Trabajo de pregrado]. Universidad Santo Tomás, Bucaramanga, Colombia.

Licencia Creative Commons

Atribución-NoComercial-SinDerivadas 2.5 Colombia