Estudio de las causales de incumplimiento al contrato de obra que tiene por objeto la “construcción parque temático de la campana, en la vereda Ucuenga en el Municipio de Nobsa-Boyacá”
Cargando...
Fecha
Autores
Peñaranda Meneses, Evelyn Fernanda
Palacios Herrera, María Carolina
Director
Enlace al recurso
DOI
ORCID
Google Scholar
Cvlac
gruplac
Descripción Dominio:
Título de la revista
ISSN de la revista
Título del volumen
Editor
Universidad Santo Tomás
Compartir
Documentos PDF
Descripción
El presente estudio analiza las deficiencias en el cumplimiento de obligaciones contractuales durante la ejecución del proyecto “Construcción del Parque Temático de La Campana”, ubicado en la vereda Ucuenga del municipio de Nobsa, Boyacá mediante un enfoque cualitativo descriptivo, basado en la revisión de informes técnicos, contratos y actas de seguimiento. Dentro de la revisión realizada se identificaron diversas falencias que afectaron la correcta supervisión de la obra, ocasionando retrasos e impactos financieros, entre los principales hallazgos se destacan la falta de seguimiento técnico, deficiencias en la planeación contractual, ausencia de mecanismos eficaces de control, y débil comunicación entre las partes involucradas. Asimismo, se evidenciaron vacíos normativos y una capacidad institucional limitada para ejercer las funciones de control y supervisión requeridas. El análisis permitió concluir que el incumplimiento del contrato no responde a una causa aislada, sino a la convergencia de deficiencias estructurales propias de la gestión pública local. De igual manera, el estudio propone una serie de estrategias de mejora orientadas al fortalecimiento institucional, a la optimización de los procesos de contratación pública.
Abstract
This study analyzes the shortcomings in the fulfillment of contractual obligations during the execution of the "La Campana Theme Park Construction" project, located in the Ucuenga district of the municipality of Nobsa, Boyacá, using a descriptive qualitative approach based on a review of technical reports, contracts, and monitoring records. The review identified several deficiencies that affected the proper supervision of the project, causing delays and financial impacts. Key findings include a lack of technical monitoring, deficiencies in contract planning, an absence of effective control mechanisms, and weak communication among the parties involved. Furthermore, regulatory gaps and a limited institutional capacity to perform the required control and supervision functions were evident. The analysis concludes that the contract breach is not due to an isolated cause, but rather to the convergence of structural deficiencies inherent in local public management. The study also proposes a series of improvement strategies aimed at institutional strengthening, optimizing public procurement processes, and enhancing the technical qualifications of the oversight teams. Additionally, the incorporation of innovative methodologies, such as Building Information Modeling (BIM) and Lean Construction, is recommended to improve the planning, control and efficiency of future public works, thus contributing to risk mitigation and the effective fulfillment of contractual objectives.
Idioma
spa
Palabras clave
Citación
Peñaranda Meneses, E. F., Palacios Herrera , M. C. (2025) Estudio de las causales de incumplimiento al contrato de obra que tiene por objeto la “construcción parque temático de la campana, en la vereda Ucuenga en el Municipio de Nobsa-Boyacá” [Tesis de posgrado] Universidad Santo Tomás, Bucaramanga, Colombia